Stormwater Detention

Design-build and installation of stormwater management systems for commercial and municipal applications.

Stormwater Detention

Scope of Work

Our stormwater management services include construction of detention and retention facilities, permeable pavement systems, bioswales, and outlet structures. We work from engineering plans or provide design-build services in coordination with civil engineers.

Installation encompasses excavation, grading, liner systems, underdrain installation, outlet control structures, and final vegetation establishment. Our crews understand the critical relationship between grading tolerances and hydraulic performance.

Typical Project Types

  • Underground detention vault systems
  • Surface detention basins with landscaping
  • Retention pond construction and restoration
  • Permeable pavement parking areas
  • Bioswale and rain garden installation
  • Outlet control structure construction
  • Green infrastructure retrofits

Safety and Compliance Considerations

All excavations for detention facilities follow slope stability requirements based on soil conditions. Dewatering systems are employed as needed to maintain dry working conditions during construction.

NPDES compliance is maintained through erosion control measures and inspection protocols. Temporary stabilization is installed on exposed slopes pending final vegetation establishment.

Outlet structures are constructed in accordance with local drainage ordinances and watershed management plans. Flow control devices are tested and verified prior to system acceptance.

Industries Served

Municipalities

Watershed improvement projects and regulatory compliance

Commercial Developers

Site stormwater management for new development

Industrial Facilities

NPDES permit compliance and water quality management

Educational Institutions

Campus drainage improvements and green infrastructure

Request Project Information

Contact us to discuss stormwater management requirements and site conditions.

Request a Bid